TURNKEY LABORATORY ESTABLISHMENT
Since the laboratory design is not done with serious analysis while designing the building, it is highly possible to encounter many undesirable situations afterwards. Many criteria must be analyzed seriously from the very beginning in laboratory design. Together with these important criteria to be considered below, the fact that all work is done by a main contractor has a serious contribution to the control and efficiency of the work.